New Fashion Design for Indoor Playground Climbing Wall Structure for Kids for Bangladesh Factory

Short Description:


Product Detail

Showroom

Production

Why choose Mutong?

Feedback from Customers and our Employees

Product Tags

Related Video

Feedback (2)

With advanced technologies and facilities, strict high quality regulate, reasonable price tag, excellent support and close co-operation with shoppers, we have been devoted to furnishing the best benefit for our buyers for Outdoor Playground Equipment Johannesburg , Rock Climbing Wall In Home , Aqua Park Zaragoza , We are also constantly looking to establish relationship with new suppliers to provide innovative and smart solution to our valued customers.
New Fashion Design for Indoor Playground Climbing Wall Structure for Kids for Bangladesh Factory Detail:

 

Indoor Playground Climbing Wall Structure for Kids

Item Name:  Indoor Playground Climbing Wall Structure for Kids

Size (cm):

 OEM

Certificates:

 CE,ISO14001, ISO18000, ISO9001, GS Certificate from TUV Company of Germany

Material:

 A. Plastic parts: Imported LLDPE from KoreaB. Post: National standard galvanized steel pipe

C. Metals: Galvanized

Different material is available at your demand.

 Advantage:

 a.Anti-UVb.Anti-static

c.Security

d.Environmental protection

e.Color is not easy to fade

  Installation:

 a.Professional CAD instruction ,assembly procedure and project case .b.can provide the professional oversea assembly engineers

 Package:

 Plastic parts: bubble bag and pp film; Metal parts: cotton and pp film

 Special packaging is available.

Warranty:

 1 year.

Product detail pictures:

New Fashion Design for
 Indoor Playground Climbing Wall Structure for Kids for Bangladesh Factory detail pictures

New Fashion Design for
 Indoor Playground Climbing Wall Structure for Kids for Bangladesh Factory detail pictures

New Fashion Design for
 Indoor Playground Climbing Wall Structure for Kids for Bangladesh Factory detail pictures

New Fashion Design for
 Indoor Playground Climbing Wall Structure for Kids for Bangladesh Factory detail pictures


Related Product Guide:
4 Benefits of Using Outdoor Fitness Equipment
5 Craziest and Best Water Slides to Enjoy This Summer

We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of New Fashion Design for Indoor Playground Climbing Wall Structure for Kids for Bangladesh Factory, The product will supply to all over the world, such as: Bangkok , Kuala Lumpur , UK , If any product meed your demand, remember to feel free to contact us. We're sure your any inquiry or requirement will get prompt attention, high-quality merchandise, preferential prices and cheap freight. Sincerely welcome friends all over the world to call or come to visit, to discuss cooperation for a better future!

阿里巴巴表头更新

Established in 2003, Mutong is a comprehensive  amusement equipment enterprise which focus on developing, designing, manufacturing, supplying and installing indoor and outdoor recreation equipments.
After more than 15 years developing, now MUTONG owns production base with area more than 10,000M2.

Our service:
1,Theme Children park overall plan:We provide service for real estate, kindergartens, streets, communities, parks, hotels, tourist resorts, water parks and all kinds of theme parks all over the world, including project designing, equipments producing and installation.
2,Outdoor playground equipments customized service:Parent-child playground, Company League- building playground.
3,Professional customized slides:We offer customized slides with material stainless steel, fiberglass, plastic, PE and wooden.
4,Indoor playground design:Indoor playground overall plan, product sales and installation.
5,Water park equipments:Water park slides, water splash pads, water features, water sprayers including design, sales, manufacture and installation.

Our advantages:
-Factory directly price
-More than 16 years manufacture experience
- CE, ISO9001:2008,ISO14001,OHSAS18001 standards
- 56+ Countries
- Dedicated Product R&D center

Our product series: Water park equipments; outdoor playground equipments; indoor plaground equipments; fitness equipments; wooden playground equipments etc.

1525400372(1)

 

Our certificates:

2345_image_file_copy_13

 

2LGBF25R_2$6H9$KKIVPS1S

工厂生产 牧童车间

CI{)UR4``CF87W$E}([HEK9

 

 

WT0{ZSFM{5Z~@}D4JG$]GZ3



  • Building in Northern England 1950′s
    Cumberland,Village of Severam? House on hill.
    Large building projects. Civil engineering. Coal reduction mill in South Wales under construction. Long views of construction site – men with wheelbarrows. Reinforced concrete. Steel cage built for cement. Concrete pumped by pipeline. Laing lorries. Men shovel concrete. Factory in Darlington of Patents and Baldwin? Is a knitting wool factory. Statistics about building. Brabazon airliner and one and three quarter mile long runway at Filton,Bristol. Headquarters of BOAC on A4 (Great West Road). Middlesex County Hospital, Shenley in Hertfordshire (opened 1934) Carrington’s Coppice, Derbyshire opencast coal mine. Big diggers and shovels.
    Power station in Carlisle. Plymouth – generating station for British Electricity Authority. Men digging by hand in large pit full of water. Foundations. Wharf and river intake works. Cement works at Shoreham in Sussex under construction.

    Many houses under construction – The easy-form permanent house. Estates. Gosforth Plymouth estate of “Easyform” houses ( not bricks and mortar). Man walks past privet hedge. Construction of house. Scaffolding. Cavity walls. Building site in early stages. Roads built. Men lower manhole into position. Building water mains. Laying pipes. Drainage ditches. Putting solder in gap between two pipes. Laying roads. Bulldozer levelling land and removing plants. Machine digs trench and conveyer buckets carry earth off. Bucket trenching machine, used for making drainage ditches and foundation trenches. Levelling of foundations by sight-line. Cavity walls. Erecting scaffolding. Laying damp course. Rolling it out. Erecting shutters for concrete filling. Using spirit level. Making the cavity. Putting fireplace in. Blue print map of estate site. Cranes load sand, clinker and cement into cement mixing plant on the site. Grab unloads aggregate into main hopper. Mixing concrete. Adding sacks of cement, Dumper truck filled with cement. Man shovels cement into wheelbarrow. Hoist lifted and wheelbarrow unloaded into cavity wall. Compacting concrete with stick. Demonstration of compacting concrete through plate glass. Packing cement in chimney breast. Precasting window sills. Concrete flue- gathering blocks. Using spirit level on chimney. Placing wall ties in gap in wall. Constructing next two foot section of house. Fixing string tie. Pouring bucket of wet gravel over lower wall to bond with next days cement. Site agent and map on wall in his office. ‘Work completed chart”.
    Surveying. Preparing hard-core. Scaffold frames on back of lorry. Smoothing cement on new road. Removing lower shutters to reveal concrete face of first lift. Big metal rod cutters cut steel reinforcing rods. Inserting rods in wall. Larger lorry with timber. Carpenter and joiner. Saws. Joists. Creosoting ends of joists and wrapping them in bituminous felt. Carrying joists. Carpenters fitting joists. Man lifts first floor joist over scaffolding. Fitting joists. Oiling shutters. Removing wooden mould from chimney breast. Hauling wheelbarrow on hoist up to next level. Inserting hose in cavity to wash it out. “Easyform” employs unskilled labour. Insulation material inserted in cavity. Roofing. Timber lifted to roof. Steel window frames inserted into openings. Laying roofing felt. Tiles unloaded from lorry. Man carries tiles on his head. Man carries ladder with tiles on his head. Prefabricated staircases carried to the house. Man paints outside of house – Tyrolean finish of colour mix provided by hand-held machine. Plan of site.
    Building site in Hollington estate at Hastings, Sussex. Plan of two semi-detached houses. Finished houses on estate. Two babies in pram in front garden. Slums and slum housing and cramped conditions shown. Cramped courtyards. Lots of washing on washing lines. But the “Easyform” house allows ” housewife plenty of elbow-room for chores” – lines of washing in pleasant surroundings. Estate with flower beds in front. Porches, gardens full of roses.
    Carlton House Terrace in The Mall. “Royal Crescent of Bath” in close up.
    Turn of century roofs of houses and crowded terraces. Lots of chimney pots.
    Cul-de-sac with shooting-brake car with wooden back half driving down hill. Large apartment block in a town. Countryside cottages. Weather boarded country cottage painted white. Panoramic sweep of building site. Easyform houses can be semi-detached or terraced – we see four-house terrace. House with gabled-end. Other with hipped-roof. Outhouses. Good views from the estate. Some towns (Accrington, Gosport and Cambridge) built five “Easyform” estates. Map shows where houses are built. Plymouth and Carlisle had six contracts. Bristol has 11 contracts for Easyform housing. Easyform is not prefabricated. Various estates in the sunshine. Council housing estates. Red bus on estate.

    We are old friends, the company's product quality has been always very good and this time the price is also very cheap.
    5 Stars By Candance from Ireland - 2018.09.29 13:24
    As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Lilith from Bogota - 2018.07.27 12:26

    Send your message to us:

    INQUIRY NOW
    • * CAPTCHA: Please select the Plane

    Related Products

    Write your message here and send it to us
    WhatsApp Online Chat !